  • 24-storeyed residential building. Odessa city
  • 16-storeyed residential building. town Sevastopol
  • Trade and Exhibition Complex Saturn, 95th quarter. S = 5000m2
  • Shopping and entertainment center, st. Spasskaya. S = 3200m2
  • Shopping complex on the st. Desantnaya. Sub-district Zarechny. S = 7890m2
  • Shopping complex, st. 23 Lutogo. Near the  bus stop"Boarding"S = 1200m2 »
  • Car wash with cafe for 40 seats. Nikolaevskiy highway
  • Reconstruction of the cinema"Zhovten", st. Mussorgsky in the shopping center"Big Spoon"»
  • Car dealership"Bogdan", st. Meleshkina. (reconstruction) S = 780m2
  • Shopping complex, st. Meleshkina. S = 3000m2
  • Shopping complex, st. Cosmonauts. S = 1500m2
  • Shopping complex, st. Meleshkina, near the cinema"Olympus". S = 2000m2
  • Shopping complex"Maxim", st. Yesenin. S = 9000m2
  • Exhibition Hall"Dask", st. Otto Brozovsky S = 1300m2
  • Shopping complex"Megamax", st. Gagarina, the 95th quarter. S = 4200m2
  • An extension to the Foxtrot department store, Metallurgov Ave. S = 4700m2
  • Shopping complex, st. 22nd Partsyezd S = 3900m2
  • Restaurant"Iceberg", Krivoy Rog, st. Zemlachky (reconstruction). S = 540m2
  • Youth Center"Anthill"(reconstruction), Krivoy Rog, st. 22nd Partsyezd . S = 860m2
  • TAS-Commerzbank", Krivoy Rog, Mira Ave. S = 2300m2
  • Shopping complex"Atrium", Krivoy Rog, st. Kobylyansky S = 3400 m2
  • Ukrainian House of Furniture". Krivoy Rog, Sub-district Zarechny . S = 3200m2
  • Construction of ATB stores near the city of Kryvyi Rih:
    • St. Peter of Kalnyshevsky, building 4K, S=1750m2;
    • st. Kosmonavtiv, b. 3a, P=1750m2;
    • st. Kryvorizhstal, 9th floor, S=1750m2;
    • 16 Postovi Ave., S=1750m2;
    • st. TV, 16, P=1750m2.

    PJSC ZAPOROZHSTAL

    Reconstruction of blast furnace -3.  Cast house and  furnace house

    Blast-furnace department . Building the retaining wall of the unloading trench of the car dumper in the  ore field

    LLC METINVEST ENGINEERING

    Construction and mounting, testing and commissioning of the first start-up complex of technological equipment and communications for the project of the first stage of the complex for the preparation and injection of pulverized coal into the furnaces of blast furnaces of

    PJSC MK AZOVSTAL

    • Construction of a complex of  steel billet continuous casting machine No. 4 at the PJSC"MMK named for Ilyich
    • Installation and fabrication of  steel construction for cable lines,  water services  construction unit and external energy networks of  steel billet continuous casting machine  No. 4
    • Construction and mounting work on the installation of foundations for the facility"Construction of a complex of  steel billet continuous casting machine No. 4 at PJSC MMK Ilyich
    • Major repairs of the blast-furnace department No. 3 at PJSC"MK Azovstal
    • “Reconstruction of the gas purification system of the ladle furnace No. 1.2 (1st and 2nd stage) of the department of continuous casting steel at PrJSC MK AZOVSTAL

    LLC YUROMASH

    Construction of  production area at the address Krivoy Rog, st. Leonid Borodich, 31

    Government Enterprise "Ice Arenas":

    • Design and reconstruction works of the building of the Universal Showy Sports Palace Meteor in Dnepropetrovsk. 
    • Design and construction of a basketball training base on st. Shcherbitsky in the city of Dneprodzerzhinsk.

    Corporation "System SSB":

    • Pig farm closed type.
    • Reconstruction of the oil seed processing complex (plant in Kirovograd)

    PJSC ArcelorMittal Kryvyi Rih:

    • Reconstruction of the dust exhausting plant of the  grinding-sorting factory mine management
    • Conventional power plant . Reconstruction with replacement of gas exhaust ducts, construction of new gas treatment plants behind convectors No. 1-6.
    • Blast-furnace department No. 2.  New construction of a complex for the preparation and injection of pulverized coal into a blast furnace No. 9
    • A new oxygen block (60 thousand m3 / year) with regulation of the production level (Technical re-equipment of the Nitrogen and Oxygen pipelines).
    • Object  remote control -1.Blast-furnace department -6. Reconstruction of cold blast air vents at Blast-furnace department -6
    • •"Major repairs of mining transportation department"Canteen No. 15
    • Major repairs of  ore mineral concentration plant -1 of  administration and living quarters  
    • Installation of ventilation, air conditioning and heating system of the  Public Higher Educational InstitutionKNU”Palace of Youth and Students

    PJSC InGOK

    • Improvement of the housing estate Ingulets (Ave Pobeda) 2012-2013 y
    • Expansion of the dump No. 2 - landscaping with the installation of small architectural forms (Flower clock).
    • Major repairs of the building of the Palace of Culture

    PJSC Central GOK

    • A set of repair work on the improvement of social facilities on St Mussorgsky, improvement: entrance to the park, the 44th quarter ring and the installation of City-Light PJSC Central GOK
    • Museum of Labor Glory of PJSC Central GOK
    • Maintenance of buildings and structures of the processing plant
    • Major repairs  of buildings and structures (the building of the Grekovataya station of the menegment of  railway service; a domestic industrial complex for 1000 places; the building of the consumer complex with the highway of Ordzhonikidze; the building of the  administration and living quarters plastering and stucco work of the Gleevatsky quarry; the building of the  administration and living quarters  
    • Improvement of the square"Ynost"stage II.
    • Improvement of a playground on the territory of Verabovo.
    • Improvement of  the bed of honor in the park named after the 50th anniversary of Soviet Ukraine.
    • Major repairs  of the  administration and living quarters  building
    • Major repairs  of a boarding house with. Nikolaevka
    • Major repairs of the cable gallery of section 8-9 of the enrichment plant of the processing plant
    • Major repairs  of the premises of the  training center st. Mussorgsky, 15
    • Installation of an irrigation device for conveyors of a crushing factory with a width of 1000, 1600, 2000 mm.
    • Major repairs  of the bulk of the concentrate dehydration section in terms of overhaul of the  technical water pipeline

    Processing of ferrous metal scrap in 2014-2020

    Current repair of the building of the  automatic process control system of the mining transport complex of the  management of railway service

    LLC «VBK Centrenergostroy»:

    Construction work on the construction of an indoor sports facility with artificial ice in the city of Krivoy Rog.

    LLC"Kherson Production - Construction Company":

    Construction of facilities on the territory of the Petrikovskoye Milk dairy complex.

     PJSC "Sharovskoye":

    • Reconstruction of an elevator with a capacity of 80 thousand tons of grain

    Capital Construction Department of the Executive Committee of the Krivoy Rog City Council

    • Work on the reconstruction of the improvement object, of small architectural form - the Flower Clock Pavilion
    • Self-floating sewer collector from pl. Osvobogdeniya to st. Sivolapa
    • Reconstruction of the Monument Square “Pobeda

    JSC Yuzhniy GOK

    • Major repairs of the building of the administrative building of the mine management".
    • Sports complex sports and health centre major repairs
    • Major repairs of the  administration and living quarters building of the  management of railway service  household complex".
    • Major repairs of the office building of the mine administration".
    • Facing the walls of the facade of the dining room No. 1
    • Improvement of Yuzhny Avenue, a pond of JSCYuzhniy GOK
    • Facing the walls of the facade of the Sports Palace
    • Major repairs of the enrichment building 1-10 section  ore mineral concentration plant -2

    Facing the walls of the facade of the dispatching building of the  Flaw Detection Center  with metal cassettes

    Facing the walls of the facade of the shop polyclinic with metal cassettes

    Major repairs  of the pool of the fitness center of JSCYuzhniy GOK".

    • Major repairs  of the building of the medium crushing building management crushing transport system
    • Major repairs of the building the  administration and living quarters of the slurry plant
    • Major repairs  of  bedroom block No. 6 and replacement of the windows of the dining room of recreation camp “Chaika-Krasnoe “
    • Major repairs of the facility"Building bulk 3-4 stages of management crushing transport system
    • Construction and installation works:"Construction of the engineering servicing and technical repair base"
    • Major repairs of the facility"Building  bulk No. 4 is two-story with a underground floor of 40 places
    • Reconstruction of the warehouses of the central  transfer point. Reconstruction of the building of equipment No. 5. Membrane Roofing
    • Repair of a one-story summer cinema building, 500 seats
    • Major repairs of the building of  administration and living quarters, three-story  mining plant administration
    • Installation of ventilation system equipment in the building of the  administration and living quarters of the  mining plant administration
    • Major repairs of the building of the transshipment unit 3p,  management crushing transport system
    • Major repairs of the building of the the  administration and living quarters four-story  management repair  technological equipment
    • Major repairs of the building of  administration and living quarters , three-story (1-2 floors)  mining plant administration
    • Current repair of a two-story building of the sports complex
    • Current repair of the building of the dispatching garage, the building of the box for the specialized repair of  machine  at the automobile  transportation department
    • Reconstruction of the quarry in connection with its deepening in order to maintain the capacity of the plant. Stage II (until 2020). Engineering servicing and technical repair base (territory of the oxygen plant). Main building
    • Current repair of the fuel and lubricants warehouse building is one-story
    • Major repairs of the building of the station for  conveyer  ore transport drives from the quarry to the  management crushing transport system  factory
    • Major repairs  of the building of the warehouse department  telecommunications service two-story  central  transfer point and  warehousing facilities
    • Construction of the fourth concentrate loading point
    • Reconstruction of the tailings facility and recycling water supply to maintain the plant’s capacity. Tailings pond “First map” (reconstruction of the “United” tailings pond). Extension of dams above elevation + 146.0 m. Construction of the thickening unit.

    PJSC Northern GOK

    • Major repairs  , replacement and strengthening of  flue-pipe  No. 1; 2 department of manufacturing servising-2
    • Major repairs   of technological equipment
    • Current repair and maintenance of technological equipment (hydrocyclones)
    •  "Major repairs   of technological equipment (separators, deslimer, conveyers, classifiers, pumps)

     